Recently I'd toilet work finished. I renovated the whole unit. I had organized almost everything using a contractor coupled with not thought about how I'd remove the existing toilet suite. I assumed the contractor would go away, and remove it for me Individually but when he arrived to start out the do the job, he inquired about what I required him